Take a look at a few of our previously completed projects to get a better idea of the kind of work we do at Herbert Anderson Jr. Construction. We are trusted experts in our field and specialize in a variety of construction services and projects including commercial developments, educational facilities, water and wastewater facilities, office and retail complexes, and more.

ward poultry farm
Ward Poultry Farm
Chappells, SC
  • New chicken house complex for private chicken grower.
  • Land disturbance of over 22 acres.
  • Approximately 85,000 cubic yards of earthwork.
  • Building pads for 8 new chicken houses (60’ x 600’ per house)
  • Supporting loadout area in front of houses.
  • Construction of access roads from highway to complex.
  • Scope of work included clearing, erosion control, grading, stone base, and storm drainage
velux-greenwood llc, facility expansion
Velux-Greenwood, LLC – Facility Expansion
Greenwood, SC
  • Industrial facility expansion for Velux-Greenwood, LLC.
  • Land disturbance of over 6 acres.
  • Approximately 15,000 cubic yards of earthwork.
  • Approximately 50,000 sf of total building area.
  • Detention Pond for current development.
  • Grading for building pad, parking lot, fire loop road, and loading dock.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, storm drainage, sanitary sewer, fire line, domestic water line, and pavement markings.
north augusta water treatment plant
North Augusta Water Treatment Plant – Phase 1 Improvements
North Augusta, SC
  • Improvements to existing water treatment facility for City of North Augusta.
  • Approximately 5 acres of land disturbance.
  • Grading to support new treatment structures, including new clearwell.
  • Excavation and backfill of new treatment structures.
  • Driveways and parking areas to support new facilities.
  • Scope of work included clearing, demolition, erosion control, grading, structural excavation and backfill, stone base, asphalt pavement, and pavement markings.
newberry landing phase one
Newberry Landing – Phase 1
Newberry, SC
  • Single family neighborhood development.
  • Land disturbance of over 25 acres.
  • Approximately 65,000 cubic yards of earthwork.
  • Neighborhood Development with 82 homesites.
  • Detention Pond.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, site concrete, curb and gutter, storm drainage, sanitary sewer, and water distribution.
  • Ongoing planning and coordination with owner to develop remaining lands.
mt olive baptist church parking lot
Mt. Olive Baptist Church Parking Lot
Saluda, SC
  • Installation of new parking lot for existing church facility.
  • Approximately 2 acres of land disturbance.
  • Clearing and grading to support new parking lot on church property.
  • Scope of work included clearing, demolition, erosion control, grading, storm drainage, stone base, asphalt pavement, and pavement markings
longleaf senior village
Longleaf Senior Village
Aiken, SC
  • New housing development for private developer.
  • Land disturbance of over 7 acres.
  • Approximately 20,000 cubic yards of earthwork.
  • 12 housing units and 1 community building.
  • Supporting drives and parking areas.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings
hunters creek plantation
Hunter’s Creek Plantation
Greenwood, SC
  • Private development pioneered by Herbert Anderson Jr. on family owned land
  • 27-Hole Golf course, including clubhouse, tennis courts, swimming pool, and maintenance facility.
  • Neighborhood Development with 575 homesites.
  • Approximately 10 miles of roads constructed.
  • Land disturbance of over 800 acres spanning multiple counties.
  • Construction of community pond.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, site concrete, curb and gutter, storm drainage, sanitary sewer, and water distribution.
horne poultry farm
Horne Poultry Farm
Chappells, SC
  • New chicken house complex for private chicken grower.
  • Land disturbance of over 20 acres.
  • Approximately 70,000 cubic yards of earthwork.
  • Building pads for 8 new chicken houses (60’ x 600’ per house)
  • Supporting loadout area in front of houses.
  • Construction of access roads from highway to complex.
  • Scope of work included clearing, erosion control, grading, stone base, and storm drainage.
greenwood industrial park north spec
Greenwood Industrial Park North Spec Building
Greenwood, SC
  • Speculative Building site for Greenwood County.
  • Land disturbance of over 18 acres.
  • Approximately 100,000 cubic yards of earthwork.
  • Approximately 250,000 sf of total building area.
  • Detention Pond for future development.
  • Grading for future building pad, parking, and loading docks.
  • Industrial park entrance road improvements.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, and pavement markings.
Greenwood Fabricating and Plating – Hodges Facility
Greenwood Fabricating and Plating – Hodges Facility
Greenwood, SC
  • New industrial facility for Greenwood Fabricating and Plating.
  • Land disturbance of over 10 acres.
  • Approximately 25,000 cubic yards of earthwork.
  • Approximately 35,000 sf of total building area.
  • Detention Pond for current and future development.
  • Grading for building pad, parking lots, and loading docks.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, sanitary sewer, fire line, domestic water line, and pavement markings.
garrett poultry farm
Garrett Poultry Farm
Laurens, SC
  • New chicken house complex for private chicken grower.
  • Land disturbance of over 20 acres.
  • Approximately 120,000 cubic yards of earthwork.
  • Building pads for 6 new chicken houses (60’ x 600’ per house)
  • Supporting loadout area in front of houses.
  • Construction of access roads from highway to complex.
  • Scope of work included clearing, erosion control, grading, stone base, and storm drainage.
d&D farms poultry farm
D&D Farms Poultry Farm – Phase 1
Newberry, SC
  • New chicken house complex for private chicken grower.
  • Land disturbance of over 20 acres.
  • Approximately 40,000 cubic yards of earthwork completed in Phase 1.
  • Building pads for 4 new chicken houses (60’ x 600’ per house)
  • Supporting loadout area in front of houses.
  • Construction of access roads from highway to complex.
  • Scope of work included clearing, erosion control, grading, stone base, and storm drainage.
break on the lake
Break On The Lake
Greenwood, SC
  • New lakefront development to support new restaurant and housing development.
  • Land disturbance of approximately 13 acres.
  • Approximately 100,000 cy of earthwork.
  • Supporting driveways and parking lot.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
arbys in laurens, sc
Arby’s – Laurens
Greenwood, SC
  • Restaurant site for private developer for new Arby’s.
  • Land disturbance of approximately 2 acres.
  • Supporting driveways and parking lot.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, sanitary sewer, and domestic water.
Aiken technical college
Aiken Technical College – Center for Energy & Advanced Technology
Aiken, SC
  • New educational facility for Aiken Technical College.
  • Land disturbance of over 4 acres.
  • Approximately 30,000 cubic yards of earthwork.
  • Approximately 35,000 sf of building area.
  • Supporting parking areas.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
self-regional-healthcare-medical-office-building
Self Regional Healthcare Medical Office Building
Laurens, SC
  • New medical office building for Self Regional Healthcare.
  • Land disturbance of approximately 8 acres.
  • Building footprint of approximately 30,000 sf.
  • Supporting driveways and parking lot.
  • Installation of new turning lane in SCDOT right of way.
  • Detention pond.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
university-prompt-care
University Prompt Care
North Augusta, SC
  • New prompt care facility for University Health Care System.
  • Land disturbance of approximately 2 acres.
  • Building footprint of approximately 12,000 sf.
  • Supporting driveways and parking lot.
  • Detention ponds and rain gardens.
  • Scope of work included demolition, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
st-francis-cancer-center
St. Francis Cancer Center
Greenville, SC
  • New cancer treatment facility for St. Francis hospital system.
  • Land disturbance of approximately 10 acres.
  • Building footprint of approximately 40,000 sf.
  • Supporting driveway and parking lot.
  • Loading dock and emergency access loop.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
lidl-grocery-store
Lidl Grocery Store
North Augusta, SC
  • New retail facility for Lidl Grocery Stores.
  • Land disturbance of approximately 9 acres.
  • Building footprint of approximately 36,000 sf.
  • Supporting driveways and parking lot.
  • Demolition of existing bank building.
  • Detention pond.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
dollar-general
Dollar General
Greenwood, SC
  • New retail facility for Dollar General.
  • Land disturbance of approximately 2 acres.
  • Building footprint of approximately 14,000 sf.
  • Supporting driveways and parking lot.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
self-regional-healthcare-support-services
Self Regional Healthcare Support Services Building
Greenwood, SC
  • New support services office building for Self Regional Healthcare.
  • Land disturbance of approximately 3 acres.
  • Building footprint of approximately 20,000 sf.
  • Supporting driveways and parking lot.
  • Detention pond and rain garden.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, pavement markings, landscaping, and irrigation.
dubose-poultry-farm
Dubose Poultry Farm
Aiken, SC
  • New chicken house complex for private chicken grower.
  • Land disturbance of over 20 acres.
  • Approximately 75,000 cubic yards of earthwork.
  • Building pads for 8 new chicken houses (60’ x 600’ per house)
  • Supporting loadout area in front of houses.
  • Construction of access roads from highway to complex.
  • Scope of work included clearing, erosion control, grading, stone base, and storm drainage.
weatherford-farms
Weatherford Farms
Laurens, SC
  • New chicken house complex for private chicken grower.
  • Land disturbance of over 25 acres.
  • Approximately 135,000 cubic yards of earthwork.
  • Building pads for 8 new chicken houses (60’ x 600’ per house)
  • Supporting loadout area in front of houses.
  • Construction of access road from highway to complex.
  • Scope of work included clearing, erosion control, grading, stone base, and storm drainage.
oak-grove-farms
Oak Grove Farms
Newberry, SC
  • New chicken house complex for private chicken grower.
  • Land disturbance of over 22 acres.
  • Approximately 130,000 cubic yards of earthwork.
  • Building pads for 10 new chicken houses (60’ x 600’ per house)
  • Supporting loadout area in front of houses.
  • Improvements made to existing access road.
  • Scope of work included clearing, erosion control, grading, stone base, and storm drainage.
Saluda-county-water-treatment
Saluda County Water Treatment Facility
Leesville, SC
  • Ground-up construction of water treatment facility for Saluda County
  • Approximately 6 acres of land disturbance.
  • Grading to support new treatment structures, including 2 new clearwells and water treatment facility.
  • Excavation and backfill of new treatment structures.
  • Driveways and parking areas to support new facilities.
  • Scope of work included clearing, erosion control, grading, structural excavation and backfill, stone base, asphalt pavement, and pavement markings.
clinton-joanna-waste-water-treatment-plant
Clinton-Joanna Wastewater Treatment Plant Improvements
Joanna, SC
  • Improvements to existing wastewater treatment facility for Laurens County Water and Sewer Commission.
  • Demolition and removal of several existing treatment structures.
  • Grading to support new treatment structures, including new aeration basin.
  • Excavation and backfill of new treatment structures.
  • Driveways and parking areas to support new facilities.
  • Scope of work included clearing, demolition, erosion control, grading, structural excavation and backfill, stone base, and asphalt pavement.
cayce-wastewater
Cayce Wastewater Treatment Plant Improvements
Cayce, SC
  • Improvements to existing wastewater treatment facility for City of Cayce.
  • Demolition and removal of several existing treatment structures.
  • Approximately 5,000 tons of concrete crushed on site.
  • Demolition of approximately 10,000 lf of existing pipes.
  • Grading to support new treatment structures, including 2 clarifiers.
  • Excavation and backfill of new treatment structures.
  • Driveways and parking areas to support new facilities.
  • Scope of work included demolition, erosion control, grading, structural excavation and backfill, stone base, asphalt pavement, site concrete, storm drainage, and pavement markings.
piedmont-tech
Piedmont Technical College – Center for Advanced Manufacturing
Greenwood, SC
  • New educational facility for Piedmont Technical College.
  • Land disturbance of over 22 acres.
  • Approximately 100,000 cubic yards of earthwork.
  • Approximately 50,000 sf of building area.
  • Supporting parking areas.
  • Detention pond.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
north-augusta-high-school
North Augusta High School (Phase 1 & 2)
North Augusta, SC
  • Additions to high school facility for Aiken County School District.
  • Land disturbance of over 17 acres.
  • Approximately 150,000 cubic yards of earthwork.
  • Approximately 100,000 cubic yards of imported dirt.
  • Approximately 200,000 sf of total building area.
  • Supporting roads and parking areas.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
Greenwood-School-District-50-Bus-Facility
Greenwood School District 50 Bus Facility
Greenwood, SC
  • New bus storage facility for Greenwood School District 50
  • Land disturbance of over 12 acres.
  • Approximately 30,000 cubic yards of earthwork.
  • Approximately 35,000 sy of pavement area.
  • Detention pond.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
leavelle-mccaambell-middle-school
Leavelle McCampbell Middle School
Graniteville, SC
  • Ground-up middle school facility for Aiken County School District.
  • Land disturbance of over 30 acres.
  • Approximately 300,000 cubic yards of earthwork.
  • Approximately 125,000 sf of total building area.
  • Supporting roads and parking areas.
  • Recreational field.
  • Road widening to accommodate increased traffic volume.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, and pavement markings.
Ample-Storage
Ample Storage
West Columbia, SC
  • New self-storage facility for private developer.
  • Land disturbance of approximately 7 acres.
  • Approximately 30,000 cy of earthwork.
  • Building footprint of approximately 115,000 sf.
  • Supporting driveways and parking lot.
  • Construction of detention pond to serve project.
  • Scope of work included clearing, demolition, erosion control, grading, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
Breezy-Hill-Self-Storage
Breezy Hill Self Storage
Graniteville, SC
  • New self-storage facility for private developer.
  • Land disturbance of approximately 15 acres.
  • Approximately 50,000 cy of earthwork.
  • Building footprint of approximately 85,000 sf.
  • Supporting driveways and parking lot.
  • Construction of detention pond to serve project and future outparcels.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
Holiday-Inn-Express-Greenwood
Holiday Inn Express
Greenwood, SC
  • Hotel site for private developer.
  • Land disturbance of approximately 4 acres.
  • Approximately 15,000 sf of total building area.
  • Supporting driveways and parking lot.
  • Detention basin.
  • Scope of work included clearing, demolition, erosion control, grading, soil remediation, stone base, site concrete, storm drainage, sanitary sewer, domestic water, and fire line.
walnut corner
Walnut Corner
North Augusta, SC
  • Commercial development for private developer.
  • Land disturbance of approximately 4 acres.
  • Approximately 25,000 sf of total building area, multiple structures.
  • Supporting driveways and parking lot.
  • Detention basin.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, concrete pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
Walmart-Supercenter-Greenwood
Walmart Supercenter
Greenwood, SC
  • Ground-up retail facility for Walmart.
  • Land disturbance of over 20 acres.
  • Approximately 250,000 cubic yards of earthwork.
  • Approximately 175,000 sf of total building area.
  • Supporting parking areas.
  • Site preparation for future outparcels.
  • Scope of work included clearing, demolition, erosion control, grading, and storm drainage.
Columbia-Farms-Hatchery
Columbia Farms Hatchery
Monetta, SC
  • Industrial chicken hatchery for Columbia Farms.
  • Land disturbance of approximately 10 acres.
  • Approximately 60,000 sf of total building area.
  • Detention pond.
  • Scope of work included erosion control, grading, stone base, asphalt pavement, gravel pavement, site concrete, storm drainage, sanitary sewer, domestic water, fire line, and pavement markings.
Ridge-Spring-Industrial-Site
Ridge Spring Industrial Site
Ridge Spring, SC
  • Speculative industrial park for Saluda County.
  • Land disturbance of over 10 acres.
  • Approximately 75,000 cubic yards of earthwork.
  • Approximately 200,000 sf of total building area.
  • Grading for future rail spur.
  • Industrial park entrance road/cul-de-sac.
  • Detention pond.
  • Scope of work included clearing, demolition, erosion control, grading, stone base, asphalt pavement, site concrete, storm drainage, landscaping, and pavement markings.
project-pollo
Project Pollo
Ward, SC
  • Industrial processing facility for SC Pet Food Solutions, LLC.
  • Land disturbance of over 230 acres.
  • Approximately 400,000 cubic yards of earthwork.
  • Approximately 100,000 sf of total building area, multiple structures.
  • 5 wastewater lagoons.
  • 9 temporary sediment basins to support spray field construction.
  • 5 permanent detention basins.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, gravel pavement, site concrete, storm drainage, and pavement markings.
trolley run overhead image
Trolley Run Subdivision
Aiken, SC
  • Single-family neighborhood development
  • Constructed in multiple phases based on market demand.
  • Approximately 5 miles of new roads constructed.
  • Over400 new homesites developed.
  • Land disturbance of over 200 acres.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, site concrete, curb and gutter, storm drainage, sanitary sewer, and water distribution.
  • Ongoing planning and coordination with owner to develop remaining lands
sage-creek overhead image
Sage Creek Subdivision
Graniteville , SC
  • Singlefamilyneighborhood development
  • Constructed in multiple phases based on market demand.
  • Approximately5miles of new roads constructed.
  • Over 500 new homesites developed.
  • Land disturbance of over 130 acres.
  • Scope of work included clearing, erosion control, grading, stone base, asphalt pavement, site concrete, curb and gutter, storm drainage, sanitary sewer, and water distribution.
  • Ongoing planning and coordination with owner to develop remaining lands

Herbert Anderson Construction has been doing site work for H.G.Reynolds Co. for the last 40 years and they have always completed on time and within budget. We look forward to many more years ofworking with Anderson to deliver quality projects for our clients

Jeffrey Reynolds